The RANGE Framework, by Jon Peck, founder of RANGE Hospitality Advisory. The Shift System: Generate, on one page.

Two pages for each fix. The worksheet builds the system with the manager who will own it and tries it on live shifts. The Shift System is the one page that sets the routine, the owner and what a bad week sets off.

Start the worksheet

Free, with no sign-up. What you type stays on this device; print both pages to keep a copy, or go straight to the document. Step 4: Generate explains the step in full.

RANGE Framework · Step 4 of 5 · Generate momentum through process improvement · Page 1 of 2

Worksheet: Building it with the managers

What system produces the result every shift, with nobody checking? Needs The Short List, passed.

One set of sheets for each fix on The Short List. Build the system with the manager who will own it, and try it on live shifts before calling it done.

From The Short List.

What kind of system

Most fixes become one of these.

With nobody watching, what keeps this part of the shift to standard now?

Think of the most recent change that did not last. What let it go?

Live-shift trial

Run it on live shifts with the manager who will own it. Note what slipped and what changed.

ShiftRun byHeld?What slippedChange made

Next: the working goes onto page 2, The Shift System, the one page that gets signed and handed to Elevate.

rangeframework.com/tools/shift-system · page 1 of 2

RANGE Framework · Step 4 of 5 · Generate momentum through process improvement · Page 2 of 2

The Shift System

The one page Generate hands on, one for each fix: the routine, the manager who owns it, and what a bad week sets off.

Its name, and the fix it builds into the week.

What happens, step by step, on which shift or day, and who does each step.

The manager who owns it, not the person who built it, and who covers when they are off.

Which number, where it is read each week, on which day and by whom.

What a bad week sets off

Decided now, before the first bad week.

RowSets offOwnerReport back by
One bad week
Two in a row

The checklist, scorecard or prep list that holds it, and where it lives.

The third-month check

Three months from the start, someone confirms it still runs with nobody checking.

Check dateConfirmed byStill running?
Done when: This system is still running in its third month, and nobody senior is checking on it.

rangeframework.com/tools/shift-system · page 2 of 2

If the test does not pass.

The Shift System is finished when its test at the foot of the sheet passes, not when the page is full.

If the system slipped once nobody was checking, find the part the managers skip, build it into the shift, and start the three months again.

Next: The Bench MapElevate works from The Shift System. Who runs each system now, and who is next.

Step 4: Generate explains the step in full. All five templates, or all five on one page to print together. Landed here first? The Scorecard shows which step to start at.

Thirty minutes, wherever you start.

Have last period’s P&L open, and your own account of what is wrong. The first call with Jon Peck, RANGE’s founder, begins with both, the way Recognize does.

Book a call with Jon (opens in a new tab)Who is Jon Peck?

Book a call opens RANGE Hospitality Advisory’s booking page in a new tab.

Opens on rangehospitalityadvisory.com

Opens on Substack

Opens on jonpeck.me

Opens on LinkedIn